ATTENTION:
BEFORE YOU READ THE ABSTRACT OR
CHAPTER ONE OF THE PROJECT TOPIC BELOW, PLEASE READ THE INFORMATION BELOW.THANK
YOU!
INFORMATION:
YOU CAN GET THE COMPLETE
PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COSTS N5,000 ONLY. THE FULL
INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS
PAGE. OR YOU CAN CALL: 08068231953, 08168759420
THE IMPACT OF QUALITY
CONTROL ON ORGANIZATIONAL PERFORMANCE IN PEUGEOT AUTOMOBILE NIGERIA PLC
CHAPTER ONE
INTRODUCTION
1.0
BACKGROPUND
OF THE STUDY
The ultimate or core aim of an organization in this
world today with the level of competition is to maximize profit and the
satisfaction of consumers need through quality product irrespective of
competitors and this can be achieved by quality control in an organization.
Quality is concerned with fitness or proper quality
of product and it also goes with it price and delivery quality control takes
this form of fitting standard quality, according to specification delivery and
to schedule, the process through which the establish and need standard is
commonly call “control series” this process consist of university accepted
series of steps applied to problems quality to follows:
i.
Choosing the control
subject that is selecting what is to be regulated.
ii.
Selecting a standard
values that is specifying the quality characteristics
iii.
Creating sourcing
services which can measure these characteristic in terms of unit of measure
iv.
Interpretation the
difference between actual and standard decision making and acting on the
difference.
When the universal regulatory process as in the
above is applied to problem of product quality.
It is often called “quality control” quality
control have many definition such as.
Quality control is an attempt to identify and
analyze weakness in product and decide on how best it is to decide with those
problem or weakness so that the organization will grow.
Sometimes, the problem with a product is not that
it fails to perform to specification but rather that it does not offer any
significant advantage over competitors products already in the market.
Organization may have employees that are able and
having appropriate equipment that leads to the increase in productivity yet
sales falls below. Expectation the missing factors in many cases is the lack of
effective quality control model in the organization.
A manager in any organization needs to have
technical knowledge and competence about their product and best control model
to be adopted and the best way of handling them effectively.
1.1 STATEMENT OF THE PROBLEM
Quality control cannot be ignored if meaningful
goals and objectives are expected to be achieved.
Quality
must be control as well as all other resources use in ensuring quality product.
Currently Nigeria major problems in quality control is the use of outdated or
inappropriate technology and lack of managerial experience is another problem
facing quality control.
The success of our present day industries depends
on how to manage our resources and to enhance growth and development for the
success of industrialization to this end this research is preoccupied Peugeot
automobile (Nig.) Kaduna.
1.2 BACKGROUND OF THE ORGANIZATION
The initiative to establish Peugeot automobile
Nigeria limited was taken by the federal military government under the
leadership of General Yakubu Gowon. The idea was concretized on October, 6,
1969 when the government invited 16 reputable vehicle manufacturing companies
in the world to establish a vehicle assembly plant in the country.
Twelve years before the initiative was taken
Peugeot cars make their first entry into Nigeria when individual imported about
100 units of the cars soon become popular due to their legendary reliability
and suitability to Nigeria road conditions. The demand for Peugeot cars in
Nigeria rose sharply again in the 1960s with the further introduction of the
Peugeot 404 model with the high demand of Peugeot product which was a mark of
acceptability. It was therefore, not surprising when in may 7, 1971, Automobile
Peugeot of France proposal was selected out of those tendered by 16 various
vehicle manufacturers.
Peugeot automobile Nigeria limited, PAN was incorporated
in December 15, 1972 as limited liability company with an authorized share
capital of three million Naira. Twenty seven months after incorporation, the
head of state commissioned the assembly plant on march 14, 1975, and through
full operations had commenced on march 2, 1975.
1.3 OBJECTIVE OF THE STUDY
i.
To look into the
process of quality control in the manufacturing organization
ii.
To find out the
possible causes of low quality of the organizational product
iii.
To know the systems of
correction of quality defect of companies and suggestion and recommendation.
iv.
To reduce over
dependence on import in Peugeot Automobile Nigeria company.
1.4 SIGNIFICANCE OF THE STUDY
The significance of quality control in the production
systems cannot be over emphasized more so, in a competitive environment such as
Nigeria, it is imperative for firms to emphasis quality control to enjoy
competitive leverages so that their product could compete favourably with the
imported goods.
However, the attitudes of Nigeria manufacturing towards
quality control are less encouraging. This is evidence in poor quality
products. They do not make available to consumer or consumers it is then store
of inverse importance to the manufacture
as the study has the overall objectives at attaining suggestion which
they can effectively handle the challenges of quality control measure in their
production activities.
1.5 RESEARCH QUESTIONS
i.
What are the processes
of quality control in the manufacturing organization?
ii.
What are the causes of
low quality product in the organization?
iii.
What are the system
involved in correcting quality defect of the companies?
iv.
In what way can over
dependency on import be reduce in Peugeot Automobile Nigeria Limited?
1.6 SCOPE
OF THE STUDY
Quality control management as chosen as a topic of
relevant to the manufacturing industry in Nigeria. Although quality control
management is an activity relevant to all business organization and employees
of the manufacturing sectors. The research is restricted to the study of
quality control management on organizational performance.
HOW TO GET THE FULL PROJECT
WORK
PLEASE, print the following
instructions and information if you will like to order/buy our complete written
material(s).
HOW TO RECEIVE PROJECT
MATERIAL(S)
After paying the appropriate
amount (#5,000) into our bank Account below, send the following information to
08068231953 or 08168759420
(1)
Your project topics
(2)
Email Address
(3)
Payment Name
(4)
Teller Number
We
will send your material(s) after we receive bank alert
BANK ACCOUNTS
Account
Name: AMUTAH DANIEL CHUKWUDI
Account
Number: 0046579864
Bank:
GTBank.
OR
Account
Name: AMUTAH DANIEL CHUKWUDI
Account
Number: 3139283609
Bank:
FIRST BANK
FOR MORE INFORMATION, CALL:
08068231953 or 08168759420
https://projectmaterialsng.blogspot.com.ng/
https://foreasyprojectmaterials.blogspot.com.ng/
https://mypostumes.blogspot.com.ng/
https://myeasymaterials.blogspot.com.ng/
https://eazyprojectsmaterial.blogspot.com.ng/
https://easzprojectmaterial.blogspot.com.ng/
Comments
Post a Comment